To Delmon Readymix

VIP Gatehouse Completed in Record Time

Posted: January 12, 2023

His Majesty King Hamad bin Isa Al Khalifa recently laid the foundation stone at a ceremony for the Kingdom of Bahrain’s new National Assembly Building. As part of the ceremony, he arrived to the site through the VIP Gatehouse which was recently manufactured and installed during a one month construction schedule by the Delmon Precast team.

The building included ninety-eight Structural Precast Elements along with one hundred and four GRC Precast Units. To top off the gate a four metre diameter GRC dome completed the structure. Standing at over 20m in height the project offered some unique challenges due to the size of elements and project timeframe. Delmon Precast is proud to have delivered this noteworthy project safely and on time as per our client’s requirements.

Project Name       : VIP Gate, National Assembly Buildings

Client                     : Ministry of Works

Consultant            : Gulf House Engineering

Main Contractor   : Nass Contracting

Previous Post | News Index | Next Post